Green power plant A&S Energie

Aspiravi manages the A&S Energy green power plant located in Oostrozebeke, West Flanders. This installation is a 50/50 collaboration between Aspiravi NV and Unilin NV (previously Spano NV).

Construction of the plant started in August 2008. The installation became operational in the summer of 2010. Every year, 170,000 tonnes of non-recyclable wood residues are processed into green electricity for 55,000 households.

All the information about A&S Energy is available at their website.

Technical information

Number of households
55.000
Start of production
2010
Capacity
25 MW
Owner
A&S Energie
Share of Aspiravi
50 %

Biomass